| Year | 2022 |
| Value | US$ 2.6 M |
| Scope | ✓ HV Bus Duct ✓ HV Cable Works |
• Removal of existing 33kV, 11kV Bus duct & Bus bar on both side between LV side of Power Transformer and HV side of Earthing Transformer.
• To carryout required modification on existing Bus Ducts, cable boxes, cable trenches, cable supports, foundations and any kind of civil, mechanical and Electrical works required to lay & termination of new 33kV, 11kV cables as required.
• To supply and install Heater, Hygrostat and Thermostat on 33kV, 11kV cable boxes of Power Transformer and
• Earthing Transformer. Supply of heater, hygrostat & Thermostat including MCB and wiring is in contractor’s scope.
• Space Heater shall be of approx. 100 Watts.
Project Start Date: 2019
Completion Date: 2022