Home / Project Detail
| Year | 2025 |
| Value | US$ 1.5 M |
| Scope | ✓ Mechanical Works ✓ Piping Works |
Rehabilitation of seven (7) nos. Crude Oil tanks and three (3) nos. of fire water tanks within Dukhan Field. The scope includes spading, decontamination, inspection of floor, shell and roof plates and structures and replacement if required. Refurbishment, painting and coating in line with inspection requirements.
Sunday – Thursday
8:00 AM to 5:30 PM
Friday & Saturday
Closed
Subscribe to get our latest news and updates
Copyright © Vision Development Project, All Right Reserved. | Designed By Orange Qatar