QatarEnergy – EPIC Turbine Control System PS2 & PS3 (Offshore)

Year2022
ValueUS$ 12 M
Scope

✓ ICA Works

✓ Piping Works

✓ HVAC Works

Project Overview

• Upgrade the turbine control Panels at PS-2 and PS-3 to Siemens SIMATIC S7-400F/FH based control panels.2) associated with HVAC Control System.

• All required instrumentations including associated panels, junction boxes, add-on communication modules, converters and cabling as required for COMPLETION of the WORK.1)

• Replace the existing AB condition monitoring system on TB-5000 at PS-3 with BN-3500 series condition monitoring system.3)

• Replace the existing auxiliary DC cabinets, which include DC lube oil pump control at PS-2 and PS-3 TB5000 control room with suitable ones with new relay and terminals

• Replace the existing HVAC Control System associated Panels,Junction Boxes,Cablings,control Modules.