| Year | 2022 |
| Value | US$ 12 M |
| Scope | ✓ ICA Works ✓ Piping Works ✓ HVAC Works |
• Upgrade the turbine control Panels at PS-2 and PS-3 to Siemens SIMATIC S7-400F/FH based control panels.2) associated with HVAC Control System.
• All required instrumentations including associated panels, junction boxes, add-on communication modules, converters and cabling as required for COMPLETION of the WORK.1)
• Replace the existing AB condition monitoring system on TB-5000 at PS-3 with BN-3500 series condition monitoring system.3)
• Replace the existing auxiliary DC cabinets, which include DC lube oil pump control at PS-2 and PS-3 TB5000 control room with suitable ones with new relay and terminals
• Replace the existing HVAC Control System associated Panels,Junction Boxes,Cablings,control Modules.